Solar Re-Roofing

Re-Roofing Steps for Solar Hot Water and Solar Electric Systems

We specialize in the solar removal and replacement for re-roofing projects. Be sure to have a licensed Solar Contractor help you with the solar to protect your investment.

  1. Prior to the tear off for your new roof, Vasco will cap the lines to the panels (if they are thermal) or provide the disconnect (if they are electric) and then remove the panels.
  2. After the roof is removed and the plywood is installed, Vasco will install standoffs with flashings. The standoff is lag screwed through the plywood into the roof joist. We then leave the roofer one flashing per standoff and when the roof is done the stands are watertight.
  3. Upon the completion of the new roof, Vasco will replace the solar panels and make sure the system is back up and running.

During and After

During

During

After

After

During and after photos of a solar hot water system.

The Procedure for Solar Pool Heating Systems is Slightly Different

DuringAfter

QuickMount Flashings developed in partnership with Aquatherm Industries for the solar pool panels. These mounts meet or exceed all roofing codes, standards and best practices, are made in the USA and have patented Elevated Water Seal Technology.

There is a two-year warranty on all work and labor performed.

Please contact us for an estimate.

Calculator

Estimate Your Solar Power System

[contact-form-7 id=”550″]